Dongguan Zhonghui Precision Die Casting Technology Co., Ltd.
Leave Your Message
Products Categories
Featured Products

China ADC12 Die Casting Enclosure for 5G AAU Base Station - Reliable Suppliers and Factory Solutions

Discover high-quality products from China, where top Suppliers and reliable Factory expertise come together to deliver exceptional value. Our commitment to superior manufacturing standards ensures that you receive only the best, tailored to meet your specific needs. By partnering directly with leading Suppliers in China, we streamline the process, providing a cost-effective solution without compromising quality. Experience unparalleled craftsmanship, innovative designs, and customer satisfaction that stands out in today's competitive market. Trust our China-based Factory to fulfill your product requirements efficiently and effectively. Choose us for your next project and see the difference that quality and expertise make
  • Die Casting Machine Cold Chamber Alum Die Cast Machine 350T
  • Die Casting Method Precision Die Casting
  • Application Communications Industry
  • Machining CNC Machining
  • Material ADC12
  • Surface Double-color spraying
  • Certification ISO 9001:2015
  • Capacity 500000 Pieces/Year
  • Transport Package Wooden Pallet
  • HS Code 7616991090
  • Origin Dong Guan of China
  • Shipment By airmail or by Sea
  • Due-date Two month
  • Customized Dispensing, Copper Tubing

Product Display
Features
This cutting-edge product combines advanced technology with superior functionality to provide the ultimate solution for your base station needs.
1. Heat Dissipation
Excellent heat dissipation capabilities. As the demand for high-speed data transmission increases in 5G networks, thermal management becomes critical to ensure optimal performance. Our housings are designed to effectively dissipate heat, preventing overheating and ensuring smooth operation of the base station.
2. Corrosion Resistance
Excellent corrosion resistance. This is especially important for outdoor installations, where exposure to harsh weather conditions can cause damage to the equipment. Our enclosures are built to withstand the elements, protecting your base station from corrosion and extending its lifespan.
3. Lightweight Design
Lightweight and easy to handle and install. This is a significant advantage, especially when it comes to deploying base stations in remote or challenging locations. The lightweight design not only simplifies the installation process but also reduces transportation costs.
Process
Step 01
Aluminum die casting

Equipment: 400T aluminum die casting machine

Material: ADC12

Process characteristics:
a. Furnace temperature: 670°±20°, Material handle: 20±2MM;
b. Secondary materials cannot be used;
c. Test the material composition to confirm that it is OK and can be produced;
d. First piece confirmation is required after die-casting.
Precautions
a. The filling quality of the surface needs to be confirmed. No cold insulation, no bulging, or lack of material for the pillars.
b. Pay attention to the surface to avoid sticking molds, drawing molds, or poor ejector pin convexity.
c. The ejector pins are concave by 0-0.2mm for non-machine-added surfaces and 0-0.2mm for machine-added surfaces. The thimble needs to be convex 0-0.2mm.
Step 02
Remove spout (Saw spout and knock out slag bag)

Equipment: Sawing machine

Tools: wooden stick

Precautions
a. No crush injury or shortage of materials.
b. Control the size and appearance.
Step 03
IPQC inspection (check dimensions according to drawings)

Test tool: Caliper / Projection / Three-dimensional

Precautions
Use measuring tools correctly and check dimensions according to drawings.
Step 04
Shaping (Product back shaping)

Product back shaping

Equipment: knife-edge ruler, shaping fixture

Precautions
Within 0.25mm of the front plane of the product.
Step 05
CNC
a: CNC- CNC machining (Process the end face of the inner cavity, the end face of the surrounding heat dissipation tooth surface, and the through holes of the tooth holes.)
b: Deburring (The sharp corners of the product are chamfered, deburred, non-machined ejector pins are sharpened, and polished to smooth the appearance.)
c: 100% inspection

Use of equipment and tools: CNC machine / Flat-bottomed cutter / Drill bit / Tap processing fixture / File / Wind grinder / 120# sandpaper

Precautions
a. Do not over cut, no sand holes, no sharp corners, miss processing; without scratch, no burr; and the R corners should be connected smoothly.
b. Ensure the finish of the processed surface is Ra 0.8, control the size and shape tolerances.
c. Inspection by go gauge and no-go gauge.
d. Check the flatness of the product according to the drawing.
e. Handle the product gently to prevent deformation.
Step 06
Polishing, (manual removal)

Remove product clamping line caps, surface particles, slag bags, and gate residues.

Precautions
a. No processing be missed, no sharp corners, no sharp edges and the mold closing line should be connected smoothly.
b. Ensure the finish of the processed surface is Ra 0.8, control the size and shape tolerances.
c. Inspection by go gauge and no-go gauge.
d. Check the flatness of the product according to the drawing.
e. Handle the product gently to prevent deformation.
Step 07
Outsourcing

Powder spraying + Oil Spraying (Two-color spraying in separate areas)

Test tools: Appearance visual inspection + film thickness meter + colorimeter + salt spray tester + hundred grid test tool + alcohol resistance test + pencil test

Precautions
a. The coloring and anti-bake fractal areas are obvious, no different colors, dirt, exposed bottoms, dust accumulation, scratches, etc.
b. The color is consistent with the sample.
Step 08
IPQC inspection/IQC incoming inspection

Incoming inspection and quality control verification of components.

Precautions
a. Confirm the surface quality after powder spraying.
b. The holes need to be randomly inspected by needle gauge, inspection by go gauge and no-go gauge.
Step 09
100% inspection (Check the appearance of powder spraying)
a. 100% inspect the appearance of the powder-coated surfaces.
b. Conduct random inspections for the powder-coated performance test.
Precautions
1. The painted and anti-bake fractal area is obvious, and there is no abnormal color, dirt, exposed bottom, dust accumulation, scratches, etc.
2. The color is consistent and uniform according to the sample.
Step 10
Dispensing glue

Dispense adhesive to the specified bar area, dispensing width and height 1.0±0.1 symmetrically centered.

Tools: Dispensing machine, dispensing fixture

Precautions
1. Glue strips must be uniform, no breakage, accumulation, drawing, glue overflow, deviation, bubbles, falling off, etc.
2. Ensure that the glue cures correctly, sticks well, and meets the required tensile strength.
Step 11
Assembling (Assembly of accessories)
a. Corresponding assembly position of heat dissipation copper bar for glue assembly.
b. Lock the corresponding position of sheet metal parts with M2.5*5 screws to press the heat dissipation copper block.

Parts: SE4450 Glue, 4x Heatsink Copper Bars, 3x Sheet metal parts, 6x M2.5*5 half-round screws

Precautions
a. Copper bar dispensing slot is filled with glue according to the sample.
b. Ensure that the lock screw position is stable without loosening and slipping teeth.
Step 12
Baking (drying)

Put the products in 2 columns and 7 rows, total 14pcs neatly on the baking line, baking temperature 150℃, time 30 minutes.

Equipment: dryer

Precautions
Leave a certain gap between the product placement, pay special attention to not touching the tunnel door; hold lightly; do not touch the scratches.
Step 13
100% inspection (100% inspection of appearance + packaging)

Comprehensive visual and structural verification before final packaging.

Precautions
a. The appearance shall be inspected according to the sample. The surface shall be free of dirt, scratches, dents and defects, and the glue dispensing shall be even and without defects!
b. The tooth pattern must comply with the go gauge and no-go gauge.
c. The product is placed in the knife card, covered with flat cardboard on the upper layer, and then packaged.
Step 14
FQC inspection

Test Tools: Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection

Precautions
Whether the measuring tool is within the calibration period.
Step 15
Shipping

Final dispatch preparation and logistical logging.

Precautions
a. Make sure the quantity is the same as the order.
b. Label and stamp on the outer box.
c. Provide a shipping report.
Step 16
OQC shipping inspection

Test Tools: Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection

Precautions
Whether the measuring tool is within the calibration period. Whether it is consistent with SIP requirements and customer requirements.
Frequently Asked Questions
Q What material is used for the 5G AAU base station enclosure?
The enclosure is constructed from high-precision ADC12 aluminum alloy, processed using a 400T aluminum die-casting machine to guarantee structural integrity and performance.
Q How does this enclosure handle thermal management?
It features excellent heat dissipation capabilities designed specifically for the high-speed data transmission requirements of 5G networks, preventing overheating and ensuring smooth operational stability.
Q Is the enclosure suitable for harsh outdoor installations?
Yes, the enclosure has excellent corrosion resistance and is built to withstand extreme elements, protecting the internal base station equipment and extending its overall lifespan.
Q What surface coating treatments are applied to the product?
The product undergoes an outsourcing process of powder spraying and oil spraying (two-color spraying in separate areas), followed by a baking process at 150℃ for 30 minutes to ensure coating durability.
Q What quality control measures are implemented during production?
We implement rigorous inspections throughout the process, including IPQC dimensional checks, 100% powder coating appearance inspections, glue dispensing symmetry checks, FQC inspection, and final OQC shipping verification.