Dongguan Zhonghui Precision Die Casting Technology Co., Ltd.
Leave Your Message
Products Categories
Featured Products

China Aluminum Casting Communication Terminal Base Enclosure - Quality from Trusted Suppliers and Factory

Discover high-quality products from one of the leading China suppliers in the industry. Our factory is dedicated to manufacturing top-notch goods that meet international standards. With a commitment to excellence and customer satisfaction, we ensure that every item produced meets your specific needs. Partner with us to benefit from our extensive experience and innovative solutions, as we strive to provide unmatched service and reliability. Choose our China factory for all your supply requirements and experience the difference in quality and efficiency today
  • Die Casting Machine Cold Chamber Alum Die Casting Machine 1650T
  • Die Casting Method Precision Die Casting
  • Application Communications Industry
  • Machining CNC Machining
  • Material ADC12
  • Surface Chemical conversion membrane + Power Spraying
  • Certification ISO 9001:2015
  • Customized Dispensing, Copper Tubing
  • Capacity 400000 Pieces/Year
  • Transport Package Wooden Pallet
  • HS Code 7616991090
  • Origin Dong Guan of China
  • Shipment By airmail or by Sea
  • Due-date Two month

Process
01

Aluminum die casting

Equipment & Material
1650T aluminum die casting machine; ADC12 material
Process Characteristics
a. Material handle: 20±2mm, furnace temperature: 640°±20°;
b. The use of secondary items is not allowed;
c. Verify through testing that the material composition is suitable and can be manufactured;
d. After die casting, first piece confirmation is required.
Note
a. Verify the filling quality of the surface. It’s not the bulge, it’s not the cold insulation, it’s not the lack of material in the pillars.
b. Pay attention to the surface to prevent poor ejector pin crown, mold pulling or mold sticking.
c. For non-machined surfaces and machined surfaces, the ejector pins are concave by 0-0.2 mm. The ejector pin must have a convex shape of 0-0.2 mm.
Aluminum die casting process
02

Remove spout

Equipment
a wooden stick/ sawing machine
Things to note
a. Pay attention to the surface and don't damage it or use insufficient material.
b. Adjust size and appearance
Remove spout process
03

IPQC inspection (verify detailed dimensions in drawings)

Testing Instruments
calipers, projection, three-dimensional modeling, visual appearance inspection
Precautions
Check dimensions against drawings and use accurate measuring equipment.
04

FRONT SHAMPING

Tools
Hydraulic presses, forming tools and blade rulers
Precautions
Within 0.3mm of the front plane of the product
Front shamping process
05

iPQC inspection

Visual inspection of appearance
06

Pressed copper heat pipe- Burying heat pipes as per drawings

Equipment
Pressure Heat Pipe Fixture
Precautions
a. Copper tube must not warp and deform, rupture;
b. Filler is full, no air bubbles;
c. The surface should be careful not to bruise or burr.
d. The position of copper pipe is accurate.
Pressed copper heat pipe process
07

IPQC INSPECTION

Visual inspection of appearance
Precautions
a. The copper tube must not warp and deform or rupture;
b. The filler is full and free of air bubbles;
08

CNC

Process Details
Machining main Inlet, main Dump Port Face, Backside, Perforated Overbore
Equipment
CNC machine, flat-bottomed cutter, drill bit, tap processing fixture.
Note
a. Do not over-cut or miss processing;
b. Be careful not to scratch or burr the surface;
c. Ensure the finish of the processed surface is Ra1.6, and the size and shape tolerances
CNC Process Image 1
CNC Process Image 2
CNC Process Image 3
09

100% material inspection - Appearance visual inspection

Precautions
a. The surface of the product must be free of overcutting, sand holes, lack of material, burrs, and other undesirable phenomena.
b. Via pass and stop gauge detection
c. Check the flatness of the product according to the drawings
d. Handle the product gently to prevent deformation
10

GRIDing

Process Details
The sharp corners of the product are chamfered, deburred, non-machined ejector pins are sharpened, and polished to smooth the appearance.
Equipment
File, wind grinder, 120# sandpaper
Note
No processing should be missed, no sharp corners or burrs should be removed, and the R corners should be connected smoothly.
Gridding process
11

IPQC inspection

Visual inspection of appearance
12

Cleaning + Chemical conversion membrane + drying + power spraying

Precautions
a. No different color, dirty, not touching and scratching
b. Color according to the sample, uniform and consistent;
c. Powder thickness uniformity, no accumulation of tumor, no exposed bottom
Cleaning and spraying process
13

IPQC inspection

Visual inspection of appearance, special characteristic inspection
Note
a. After the film/powder coating surface quality confirmation.
b. Hole need to needle gauge sampling, tooth hole through the go-no go fixed gauges detection
14

Full inspection of appearance + packaging

Equipment
Carton, knife card, clapboard, bubble bag
Note
a. The appearance shall be inspected according to the sample. The surface shall be free of dirt, scratches, dents and defects, and the glue dispensing shall be even and without defects!
b. The tooth pattern must comply with go- no go fixed gauges inspection.
c. The product is placed in the knife card, covered with flat cardboard on the upper layer, and then packaged.
Packaging process
15

FQC inspection

Test Tools
Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection
Note
Whether the measuring tool is within the calibration period.
FQC inspection tools
16

Full inspection + packaging inspection

Notes
a. Appearance needs to be checked based on samples. There should be no dents, scratches or other blemishes on the surface and the glue application should be smooth and flawless!
b. The tooth shape needs to match the pass gauge and stop gauge;
c. Put the product into the knife card, cover the top of the knife card with a flat cardboard and package it.
17

Transportation

Note
a. Confirm that the quantity matches the order.
b. Label and stamp the outer box.
c. Send reports on shipments.
18

OQC shipment inspection

Inspection Instruments
calipers, projectors, tooth gauges, needle gauges, appearance, outer packaging inspection
Prepare for a rainy day
If the measuring device is still within its calibration window. Whether it meets both customer and SIP requirements.

Frequently Asked Questions (FAQ)

Q What materials and machines are used in the die casting process?

The process utilizes a 1650T aluminum die casting machine and ADC12 material. The raw material handle is kept at 20±2mm, and the furnace temperature is maintained at 640°±20°.

Q What are the key quality precautions for the pressed copper heat pipe stage?

During this stage, the copper tube must not warp, deform, or rupture. The filler must be fully packed without air bubbles, and the surface must remain free of bruises or burrs while ensuring accurate positioning.

Q How is the CNC machining surface finish verified?

The CNC machining process, using flat-bottomed cutters, drill bits, and tap processing fixtures, must ensure the finish of the processed surface reaches Ra1.6, while keeping within specified size and shape tolerances.

Q What visual requirements apply to the cleaning and powder spraying process?

The surface must show no color differences, dirt, or signs of touching and scratching. The color must remain uniform and consistent with the sample, and the powder thickness must be uniform with no accumulation or exposed bottom.

Q How are measuring instruments verified for final quality inspections (FQC / OQC)?

Inspectors verify that all measuring instruments—including calipers, projectors, tooth gauges, and needle gauges—are within their valid calibration periods and conform to customer and SIP requirements.