Dongguan Zhonghui Precision Die Casting Technology Co., Ltd.
Leave Your Message
Products Categories
Featured Products

China Aluminum Casting Communication Terminal Base Enclosure - Top Suppliers & Quality Factory Products

Discover high-quality products from top China suppliers that cater to your every need. Our factory specializes in manufacturing a diverse range of items, ensuring that we meet the demands of a global market. With a commitment to quality and competitive pricing, our China-based factory stands out among suppliers. Explore our extensive catalog to find reliable, innovative solutions tailored to your business requirements. Partner with us today and experience the excellence of China suppliers directly from the source
  • Die Casting Machine Cold Chamber Alum Die Casting Machine 1650T
  • Die Casting Method Precision Die Casting
  • Application Communications Industry
  • Machining CNC Machining
  • Material ADC12
  • Surface Chemical conversion membrane + Power Spraying
  • Certification ISO 9001:2015
  • Customized Dispensing, Copper Tubing
  • Capacity 400000 Pieces/Year
  • Transport Package Wooden Pallet
  • HS Code 7616991090
  • Origin Dong Guan of China
  • Shipment By airmail or by Sea
  • Due-date Two month

Process

Step 01

Aluminum die casting

Equipment & Material

1650T aluminum die casting machine; ADC12 material

Process characteristics
  • a. Material handle: 20±2mm, furnace temperature: 640°±20°;
  • b. The use of secondary items is not allowed;
  • c. Verify through testing that the material composition is suitable and can be manufactured;
  • d. After die casting, first piece confirmation is required.
Note:
  • a. Verify the filling quality of the surface. It’s not the bulge, it’s not the cold insulation, it’s not the lack of material in the pillars.
  • b. Pay attention to the surface to prevent poor ejector pin crown, mold pulling or mold sticking.
  • c. For non-machined surfaces and machined surfaces, the ejector pins are concave by 0-0.2 mm. The ejector pin must have a convex shape of 0-0.2 mm.
Step 02

Remove spout

Equipment

a wooden stick/ sawing machine

Things to note:
  • a. Pay attention to the surface and don't damage it or use insufficient material.
  • b. Adjust size and appearance
Step 03

IPQC inspection (verify detailed dimensions in drawings)

Testing instruments

calipers, projection, three-dimensional modeling, visual appearance inspection

Precautions:

Check dimensions against drawings and use accurate measuring equipment.

Step 04

FRONT SHAMPING

Tools

Hydraulic presses, forming tools and blade rulers

Precautions:

Within 0.3mm of the front plane of the product

Step 05

iPQC inspection

Visual inspection of appearance

Step 06

Pressed copper heat pipe- Burying heat pipes as per drawings

Equipment

Pressure Heat Pipe Fixture

Precautions:
  • a. Copper tube must not warp and deform, rupture;
  • b. Filler is full, no air bubbles;
  • c. The surface should be careful not to bruise or burr.
  • d. The position of copper pipe is accurate.
Step 07

IPQC INSPECTION

Visual inspection of appearance

Precautions:
  • a. The copper tube must not warp and deform or rupture;
  • b. The filler is full and free of air bubbles;
Step 08

CNC

Process Details

Machining main Inlet, main Dump Port Face, Backside, Perforated Overbore

Equipment

CNC machine, flat-bottomed cutter, drill bit, tap processing fixture.

Note:
  • a. Do not over-cut or miss processing;
  • b. Be careful not to scratch or burr the surface;
  • c. Ensure the finish of the processed surface is Ra1.6, and the size and shape tolerances
Step 09

100% material inspection- Appearance visual inspection

Precautions:
  • a. The surface of the product must be free of overcutting, sand holes, lack of material, burrs, and other undesirable phenomena.
  • b. Via pass and stop gauge detection
  • c. Check the flatness of the product according to the drawings
  • d. Handle the product gently to prevent deformation
Step 10

GRIDing

Process Details

The sharp corners of the product are chamfered, deburred, non-machined ejector pins are sharpened, and polished to smooth the appearance.

Equipment

File, wind grinder, 120# sandpaper

Note:

No processing should be missed, no sharp corners or burrs should be removed, and the R corners should be connected smoothly.

Step 11

IPQC inspection

visual inspection of appearance

Step 12

Cleaning + Chemical conversion membrane + drying + power spraying

Precautions:
  • a. No different color, dirty, not touching and scratching
  • b. Color according to the sample, uniform and consistent;
  • c. Powder thickness uniformity, no accumulation of tumor, no exposed bottom
Step 13

IPQC inspection

Visual inspection of appearance, special characteristic inspection

Note:
  • a. After the film/powder coating surface quality confirmation.
  • b. Hole need to needle gauge sampling, tooth hole through the go-no go fixed gauges detection
Step 14

Full inspection of appearance + packaging

Equipment

Carton, knife card, clapboard, bubble bag

Note:
  • a. The appearance shall be inspected according to the sample. The surface shall be free of dirt, scratches, dents and defects, and the glue dispensing shall be even and without defects!
  • b. The tooth pattern must comply with go- no go fixed gauges inspection.
  • c. The product is placed in the knife card, covered with flat cardboard on the upper layer, and then packaged.
Step 15

FQC inspection

Test Tools

Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection

Note:

Whether the measuring tool is within the calibration period.

Step 16

Full inspection + packaging inspection

Notes:
  • a. Appearance needs to be checked based on samples. There should be no dents, scratches or other blemishes on the surface and the glue application should be smooth and flawless!
  • b. The tooth shape needs to match the pass gauge and stop gauge;
  • c. Put the product into the knife card, cover the top of the knife card with a flat cardboard and package it.
Step 17

Transportation

Note:
  • a. Confirm that the quantity matches the order.
  • b. Label and stamp the outer box.
  • c. Send reports on shipments.
Step 18

OQC shipment inspection

Inspection instruments

calipers, projectors, tooth gauges, needle gauges, appearance, outer packaging inspection

Prepare for a rainy day:

If the measuring device is still within its calibration window. Whether it meets both customer and SIP requirements.

Frequently Asked Questions (FAQ)

What equipment and materials are used in the die casting process?

The process utilizes a 1650T aluminum die casting machine and ADC12 material. The furnace temperature is strictly maintained at 640°±20° with a material handle of 20±2mm to ensure high-quality output.

How is the quality of the pressed copper heat pipes verified?

During the embedding process, we check that the copper tubes do not warp, deform, or rupture. The filler must be fully packed without air bubbles, the surface must remain free of bruises or burrs, and the position must align precisely with the drawings.

What parameters are verified during the CNC machining stage?

CNC machining processes the main inlet, main dump port face, backside, and perforated overbore. The process ensures a surface finish of Ra1.6 and strictly monitors size and shape tolerances to prevent over-cutting or scratching.

What are the key precautions during the surface powder spraying process?

We ensure there are no color variations, dirt, or surface scratches. The color must match the sample uniformly, and the powder thickness must be consistent without any accumulation of tumor or exposed base material.

How are the finished parts packaged to prevent damage during transportation?

Products are placed carefully inside protective knife cards, layered with flat cardboard on top, and packaged securely using cartons, bubble bags, and clapboards to prevent any surface defects or deformation.

How are testing instruments and measuring devices managed for quality control?

For FQC and OQC inspections, we verify that all measuring instruments—such as calipers, projectors, tooth gauges, and needle gauges—are within their valid calibration windows and fully comply with both customer and SIP requirements.