0102030405
China Aluminum Casting Radiator Backplate Heatsinks Suppliers - Factory Direct for 5G Applications
Features
With the rapid development of 5G technology, base stations are crucial to ensure continuous connections and fast data transmission.
Exceptional Durability
The cover is constructed from high-quality aluminum for superior strength and corrosion resistance, ensuring long-lasting performance even in the most demanding conditions.
Effective Heat Control
The aluminum top is not only sturdy but also provides good heat control. Because the material has strong thermal conductivity, it can effectively dissipate heat, minimize overheating, and ensure that the base station operates at maximum efficiency.
Elegant & Functional Design
It has a sleek, modern style that blends easily into its surroundings, making it ideal for urban environments and public spaces.
Process
1
Aluminum Die Casting
Process Characteristics
800T aluminum die casting machine; ADC12 material.
a. The furnace temperature is 670°±20°, and the material handle is 20±2 mm.
b. It is impossible to utilize secondary materials.
c. Material composition must be tested to ensure it is suitable for production.
d. After die casting, the first piece must be confirmed.
a. The furnace temperature is 670°±20°, and the material handle is 20±2 mm.
b. It is impossible to utilize secondary materials.
c. Material composition must be tested to ensure it is suitable for production.
d. After die casting, the first piece must be confirmed.
Precautions
a. It is necessary to verify the quality of surface filling. There is no bulging, no cold isolation, and no shortage of materials in the column.
b. Pay attention to the surface and avoid mold stringing, sticking or insufficient ejector protrusion.
c. For non-machined surfaces, the ejector pin should be concave 0-0.2mm, while for machined surfaces, the ejector pin should be convex 0-0.2mm.
b. Pay attention to the surface and avoid mold stringing, sticking or insufficient ejector protrusion.
c. For non-machined surfaces, the ejector pin should be concave 0-0.2mm, while for machined surfaces, the ejector pin should be convex 0-0.2mm.
2
Take Out the Nozzle (Saw Nozzle) & Pull Out the Slag Bag
Tools Used
Stick or saw
Things to Note
a. Pay attention to the surface and don't damage it or use insufficient material.
b. Manage size and appearance.
b. Manage size and appearance.
3
IPQC Inspection
Testing Instruments
Three-dimensional, appearance visual evaluation, projection, calculator
Precautions
Please take the following precautions: Check dimensions against drawings and use accurate measuring equipment.
4
Dimensional Inspection
Action
Please take the following precautions: Check dimensions against drawings and use accurate measuring equipment.
Note
Within 0.25 mm from the front of the product
5
CNC (Deburring + Full Material Inspection + CNC Processing)
Process Details & Equipment
a. CNC turning: Process the through hole of the perforation, the end face of the inner cavity and the surrounding heat dissipation tooth surface.
Tools: CNC machine tools, drill bits, tap processing fixtures, flat bottom milling cutters.
b. Burr: To achieve a smooth appearance, the product's sharp corners are chamfered, deburred, and non-machined ejector pins are sharpened and polished.
Equipment: 120# sandpaper, wind mill, file.
c. Appearance visual assessment and 100% material inspection.
Tools: CNC machine tools, drill bits, tap processing fixtures, flat bottom milling cutters.
b. Burr: To achieve a smooth appearance, the product's sharp corners are chamfered, deburred, and non-machined ejector pins are sharpened and polished.
Equipment: 120# sandpaper, wind mill, file.
c. Appearance visual assessment and 100% material inspection.
Note
a. Avoid excessive cutting or improper processing;
b. Be careful not to burr or scratch the surface;
c. Verify that the finish of the machined surface is Ra0.8 and that the size and shape meet the limits.
d. The R corners should be connected smoothly, no burrs or sharp corners should be removed, and no processing should be missed.
e. The product surface must be free of burrs, blisters, lack of material and other undesirable features.
f. Use go gauge and stop gauge to detect.
g. Verify product flatness against design.
h. Handle items carefully to avoid deformation.
b. Be careful not to burr or scratch the surface;
c. Verify that the finish of the machined surface is Ra0.8 and that the size and shape meet the limits.
d. The R corners should be connected smoothly, no burrs or sharp corners should be removed, and no processing should be missed.
e. The product surface must be free of burrs, blisters, lack of material and other undesirable features.
f. Use go gauge and stop gauge to detect.
g. Verify product flatness against design.
h. Handle items carefully to avoid deformation.
6
IPQC Inspection
Details
Visual inspection of appearance
7
Polish (Manual Removal)
Actions & Requirements
Product clamp caps, slag bags, gate residues, surface particles, etc. need to be removed.
The clamping line should be smoothly connected to other parts without removing sharp edges or corners.
The clamping line should be smoothly connected to other parts without removing sharp edges or corners.
8
IPQC Inspection
Details
Visual inspection of appearance
9
Regional Powder Spraying & Organizational Powder Spraying
Test Equipment
Appearance visual inspection combined with colorimeter, film thickness meter, salt spray tester, hundred grid tester, alcohol resistance test, pencil test.
Note
a. The painted and baked-proof fractal area is clearly visible;
b. The color is consistent with the sample and the color is uniform;
c. There is no abnormal color, dirt, exposed bottom, dust accumulation, scratches, etc.
b. The color is consistent with the sample and the color is uniform;
c. There is no abnormal color, dirt, exposed bottom, dust accumulation, scratches, etc.
10
IPQC Inspection / IQC Incoming Inspection
Description
Visual inspection of appearance; inspection of specific quality.
Preventative Measures
a. Verifying surface condition after powder coating;
b. Randomly inspect/test holes using a pin gauge or a hole gauge.
b. Randomly inspect/test holes using a pin gauge or a hole gauge.
11
Full Inspection of Appearance + Packaging
Packaging Consumables
Thoroughly inspect the goods and packaging.
Consumables: dividers, containers, bubble wrap and desiccant.
Consumables: dividers, containers, bubble wrap and desiccant.
Precautions
a. Appearance needs to be checked based on samples. There should be no dents, scratches or other blemishes on the surface and the glue application should be smooth and flawless!
b. The pass and stop inspection requirements of the tooth profile must be met.
c. After the product is inserted into the knife card, the top layer is covered with a flat cardboard and wrapped.
b. The pass and stop inspection requirements of the tooth profile must be met.
c. After the product is inserted into the knife card, the top layer is covered with a flat cardboard and wrapped.
12
FQC Exam
Testing Instruments
Calipers, projectors, pin gauges, tooth gauges, visual and packaging inspection.
Note
Verify that the measurement device is still within its calibration window.
13
Transportation
Prepare for a Rainy Day
a. Confirm that the quantity matches the order.
b. Label and stamp the outer box.
c. Send reports on shipments.
b. Label and stamp the outer box.
c. Send reports on shipments.
14
OQC Shipping Inspection
Testing Instruments
Calipers, projectors, pin gauges, tooth gauges, outer packaging inspection, etc.
Note
Confirm if the measuring device is still within its calibration window. Verify whether it meets both customer and SIP requirements.
Frequently Asked Questions
What are the primary advantages of the aluminum cover?
The cover offers exceptional durability, superior strength, and high corrosion resistance due to its high-quality aluminum construction. Its strong thermal conductivity also provides excellent heat control to prevent base station overheating.
What materials and machinery are used in the die casting stage?
We utilize an 800T aluminum die casting machine and ADC12 material. The furnace temperature is controlled at 670°±20° with a material handle of 20±2 mm. Secondary materials are strictly not utilized.
What measures are taken during CNC processing to ensure surface quality?
During CNC processing, we verify that the machined surface finish meets Ra0.8. We perform deburring, chamfering of sharp corners, and polishing of non-machined ejector pins. Go and stop gauges are used to check limits, and product flatness is strictly verified.
How is the quality of the powder spraying process tested?
The regional and organizational powder spraying is tested using specialized equipment including a colorimeter, film thickness meter, salt spray tester, hundred grid tester, alcohol resistance test, and pencil test to ensure color consistency and no surface defects.
What precautions are implemented during packaging and shipping?
We inspect the goods against samples for dents or scratches. The tooth profile must pass inspection. Products are packed with dividers, bubble wrap, and desiccant, then wrapped in flat cardboard. Before shipping, quantities are matched, outer boxes are labeled/stamped, and measuring instruments are verified to be within calibration.

