Dongguan Zhonghui Precision Die Casting Technology Co., Ltd.
Leave Your Message
Products Categories
Featured Products

China Aluminum Precision Die Casting Heat Sink Suppliers - 5G CNC Machine Cooling Solution from Factory

Introducing our high-quality Aluminum Precision Die Casting CNC Machine Heat Sink, designed for optimal thermal management in various industrial applications. Manufactured in China, our heat sinks are produced by experienced suppliers who adhere to stringent quality standards. Our factory utilizes advanced die casting techniques and CNC machining processes to ensure precise dimensions and superior performance. Trust our expertise for reliable and efficient heat sink solutions that meet your specifications
  • Die Casting Machine Cold Chamber Alum Die Cast Machine 1250T
  • Die Casting Method Precision Die Casting
  • Application communication transmitter, base station
  • Machining CNC Machining
  • Material ADC12
  • Surface Cleanning + Chemical Conversion Membrane + Power spraying
  • Certification ISO 9001:2015
  • Capacity 500000 Pieces/Year
  • Transport Package Wooden Pallet
  • HS Code 7616991090
  • Origin Dong Guan of China
  • Shipment By airmail or by Sea
  • Due-date Two month

Process

1

Aluminum die casting

Equipment: 1250T aluminum die casting machine
Material: ADC12
Process characteristics
  • Furnace temperature: 670°±20°, Material handle: 20±2MM;
  • Secondary materials cannot be used;
  • Test the material composition to confirm that it is OK and can be produced;
  • First piece confirmation is required after die-casting.
Precautions:
  • The filling quality of the surface needs to be confirmed. No cold insulation, no bulging, or lack of material for the pillars.
  • Pay attention to the surface to avoid sticking molds, drawing molds, or poor ejector pin convexity.
  • The ejector pins are concave by 0-0.2mm for non-machine-added surfaces and 0-0.2mm for machine-added surfaces. The thimble needs to be convex 0-0.2mm.
2

Remove spout (Saw spout and knock out slag bag)

Equipment: sawing machine
Precautions:
  • Pay attention to the surface without crushing or shortage of materials.
  • Control the appearance and size.
3

IPQC inspection

Test tool: Caliper, projection, three-dimensional, visual inspection of appearance.
Precautions:
Use measuring tools correctly and check dimensions according to drawings.
4

SHAPING

Process: Back shaping
Equipment: Cutting edge ruler, shaping tooling
Precautions:
Within 0.3mm of the front plane of the product.
5

IPQC inspection

Inspection: Visual inspection of appearance
6

CNC

Process: Machining of internal cavity end faces, Backside holes, Side of one end, Hole through-hole
Equipment: CNC machine, flat-bottomed gong tool, Drill Bit, Tap machining jig
Precautions:
  • Do not overcut, missed processing;
  • Surface attention must not be bruised, burrs; and
  • Ensure that the surface finish Ra0.8, size, shape and location tolerances.
7

Air tightness testing

Equipment: Airtight Tooling, Airtightness Test Equipment
Test Settings
Test pressure value in 20kpa ~ 30kpa, stabilized pressure 20 seconds, test time 10 seconds, leakage control within 0.3kpa
Precautions:
  • Do a good job on the product appearance surface protection, sealing groove parts without implementation of touch scratch;
  • Discover the phenomenon of air leakage in time to pick out the marking.
8

100% material inspection

Inspection: Visual inspection of appearance
Note:
  • The surface of the product should not be overcut, sand holes, lack of material. Burrs, and other undesirable phenomena;
  • go-no go fixed gauges inspection;
  • Test the flatness of the product according to the drawing;
  • Hold the product lightly to prevent deformation.
9

Grinding

Equipment: Air grinder, 120# sandpaper
Process details
Chamfering R-angle, deburring, thimble shaving on non-machined surfaces, polishing and smoothing the shape
Note:
Do not miss the processing, no sharp corners, burrs removed cleanly, connected to the R angle of the smooth.
10

IPQC inspection

Inspection: Visual inspection of appearance
11

CLEANNING + Chemical conversion membrane + POWER SPRAYING

Precautions:
  • No different colors, dirty, not touching and scratching;
  • Color according to the sample, uniform and consistent;
  • Powder thickness is uniform, no accumulation of tumors, no exposed bottom.
12

IPQC inspection + Special Characteristics Inspection

Inspection: Visual inspection of appearance
Note:
  • Confirm the surface quality after powder spraying;
  • The holes need to be randomly inspected with a needle gauge/tested with a tooth hole pass gauge.
13

Assembling-Press riveting

Equipment: Pressure riveting jig, hydraulic press
Process details
D6 * 12 and D3 * 8 pins are clinched in the corresponding holes of the product.
Note:
  • check the pin after loading without offset, fall off, the product surface without bulging, bruises;
  • Check the height size after riveting.
14

Full inspection of appearance + packaging

Equipment: Carton, knife card, clapboard, bubble bag
Note:
  • The appearance shall be inspected according to the sample. The surface shall be free of dirt, scratches, dents and defects, and the glue dispensing shall be even and without defects!
  • The tooth pattern must comply with the go – no go fixed gauge inspection;
  • The product is placed in the knife card, and then packaged.
15

FQC inspection

Test Tools: Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection.
Precautions:
Whether the measuring tool is within the calibration period.
16

Shipping

Precautions:
  • make sure the quantity is the same as order.
  • Label and stamp on the outer box
  • Provide a shipping report.
17

OQC shipping inspection

Test Tools: Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection
Precautions:
Whether the measuring tool is within the calibration period. Whether it is consistent with SIP requirements and customer requirements.

Frequently Asked Questions (FAQ)

Q What raw materials and machinery specs are utilized during the initial casting process?
The process utilizes ADC12 material processed through a 1250T aluminum die casting machine. The furnace temperature is strictly maintained at 670°±20° with a material handle of 20±2MM.
Q What parameters are required for the air tightness testing?
The test requires a pressure value range of 20kpa to 30kpa. The pressure must be stabilized for 20 seconds, with a test duration of 10 seconds. The leakage control limit is set within 0.3kpa.
Q Which inspection tools are used during IPQC, FQC, and OQC stages?
Depending on the stage, the quality control teams utilize calipers, projection systems, three-dimensional measurement devices, needle gauges, tooth gauges, and visual inspection methods.
Q What are the critical quality controls during CNC machining?
Operators must avoid overcutting and missed processing. The surface must be free from bruises and burrs, maintaining a surface finish of Ra0.8 alongside strict dimensional and location tolerances.
Q What specifications must be followed during the assembling and riveting stage?
D6 * 12 and D3 * 8 pins are clinched into their corresponding holes using a pressure riveting jig and hydraulic press. Post-assembly checks must verify that there is no pin offset, fall-off, surface bulging, or bruises, and that the final height size is correct.