China OEM Precision Die Casting 5G Telecom Radiator Housing from Reliable Suppliers and Factory
Manufacturing Process Flow
Aluminum die casting
Take out the nozzle (saw nozzle) and pull out the slag bag
IPQC inspection (verify detailed dimensions in drawings)
Check dimensions against drawings and use accurate measuring equipment.
Product back plastic surgery
Warning: The accuracy of the front of the product is within 0.25 mm.
CNC
Polishing (hand removal)
Make sure the mold closing line is connected smoothly and there is no leakage in processing. Also, avoid sharp corners and jagged edges.
Outsourcing
IQC incoming material inspection/IPQC inspection
100% inspection (verify how powder spraying appears)
Dispensing glue
Composition of accessories and components
Drying
Leave enough space between products, be careful not to touch the tunnel door, hold lightly to avoid any bruises;
100% inspection: 100% appearance + packaging inspection
FQC inspection
If the measuring device is still within its calibration window.
Transportation
OQC shipment inspection
If the measuring device is still within its calibration window. Whether it meets both customer and SIP requirements.
Frequently Asked Questions (FAQ)
What raw materials and machinery are utilized in the initial die casting stage?
We utilize a 400T aluminum die casting machine with premium ADC12 material. The process operates under strict parameters, keeping the furnace temperature at 670°±20° and requiring first-piece confirmation post-casting.
How is precision and quality controlled during the CNC machining phase?
We maintain a surface finish of Ra 0.8 and shape tolerances through rigorous checks. The process requires avoiding over-cutting, leaving no sand holes or sharp edges, and verifying flatness relative to the technical drawings.
What testing instruments are used for quality inspections (IQC, IPQC, FQC, OQC)?
Quality assurance is conducted using a comprehensive suite of instruments including calipers, projectors, three-dimensional modeling, pin gauges, pass/stop gauges, colorimeters, film thickness meters, and salt spray testers.
What is the curing specification for the component assembly and glue dispensing?
After applying SE4450 adhesive and assembling the copper heat sinks and metal plates, the units are baked in a dryer. The drying process requires products to be arranged in 2 columns and 7 rows and baked at 150°C for 30 minutes.
How do you verify the quality of surface coating and outsourcing operations?
Outsourced two-color spraying combines powder and oil spraying. We verify surface appearance visually alongside instrument checks (e.g., film thickness, grid tests, and alcohol resistance tests) to ensure exact color matches and zero surface defects.