China Suppliers Factory Aluminum 5G Base Station Enclosure with Die Casting Heatsink for Outdoor Use
- Material handle: 20±2mm, furnace temperature: 670°±20°
- The use of secondary items is not allowed
- Verify through testing that the material composition is suitable and can be manufactured
- After die casting, first piece confirmation is required
- Verify the filling quality of the surface. It’s not the bulge, it’s not the cold insulation, it’s not the lack of material in the pillars.
- Pay attention to the surface to prevent poor ejector pin crown, mold pulling or mold sticking.
- For non-machined surfaces and machined surfaces, the ejector pins are concave by 0-0.2 mm. The ejector pin must have a 0-0.2 mm convex shape.
- Pay attention to the surface and don't damage it or lack of material.
- Manage size and appearance.
Removal of the fringe at the peripheral mold line and the inserts on the heat sink teeth. Remove the residue of side gates and slag ports, and remove the fringe at the ejector pin position.
- The product shall not be non-sanded areas and fonts missing, playing collapsed edges, poking.
- The product shall not have residual phi, shall not miss the phi, particles.
- If bad or other emergencies occur in a timely manner, isolate and immediately report to the superior to deal with.
- Pay attention to the transportation and processing process, hold and put the product lightly, do not bump the lack of, hit the deformation.
- Hang the hangtag and product identification on the top of the cardboard, QC signature OK before transferring to the next process.
- Use measuring tools correctly and check dimensions according to drawings.
- Within 0.3 mm from the front of the product
Visual inspection of appearance
Machining of internal cavity end faces, Backside holes, Side of one end, Hole through-hole
- Do not overcut, missed processing;
- Surface attention must not be bruised, burrs; and
- Ensure that the surface finish Ra1.6 size, shape and location tolerances.
Test pressure value in 20kpa ~ 30kpa, stabilized pressure 10 seconds, test time 10 seconds, leakage control within 0.3kpa
- Do a good job on the product appearance surface protection, sealing groove parts without implementation of touch scratch;
- Discover the phenomenon of air leakage in time to pick out the marking.
Visual inspection of appearance
- The surface of the product should not be overcut, sand holes, lack of material. Burrs, and other undesirable phenomena
- go-no go fixed gauges inspection
- Test the flatness of the product according to the drawing.
- Hold the product lightly to prevent deformation.
Chamfering R-angle, deburring, thimble shaving on non-machined surfaces, polishing and smoothing the shape.
- Do not miss the processing, no sharp corners, burrs removed cleanly, connected to the R angle of the smooth.
Visual inspection of appearance
Standard chemical conversion and coating application.
- No different colors, dirty, not touching and scratching;
- Color according to the sample, uniform and consistent;
- Powder thickness is uniform, no accumulation of tumors, no exposed bottom.
Visual inspection of appearance
- Surface quality confirmation after chemical conversion membrane/power spraying;
- Hole need to needle gauge sampling, go -no go fixed gauges inspection
- Check that the pins are loaded without deviation or falling off, and that there is no bulge or pressure injury on the surface of the product;
- Check the height dimension after pressure riveting;
- Glue the right amount to ensure that no spillage after loading to the pin hole.
Thoroughly inspect the goods and packaging
- The appearance shall be inspected according to the sample. The surface shall be free of dirt, scratches, dents and defects, and the glue dispensing shall be even and without defects!
- The tooth pattern must comply with the go – no go fixed gauge inspection;
- The product is placed in the knife card, and then packaged.
- Verify that the measurement device is still within its calibration window.
Logistics and shipment preparation.
- Confirm that the quantity matches the order.
- Label and stamp the outer box.
- Send reports on shipments.
- If the measuring device is still within its calibration window. Whether it meets both customer and SIP requirements.







