China Suppliers Factory Aluminum Casting Radiator Backplate Heatsinks for Efficient 5G Cooling Solutions
Features
Process
Equipment & Material: 800T aluminum die casting machine; ADC12 material
Process characteristics:
a. The furnace temperature is 670°±20°, and the material handle is 20±2 mm.
b. It is impossible to utilize secondary materials.
c. Material composition must be tested to ensure it is suitable for production.
d. After die casting, the first piece must be confirmed.
Tools: Stick or saw
Testing instruments: Three-dimensional, appearance visual evaluation, projection, calculator
Please take the following precautions: Check dimensions against drawings and use accurate measuring equipment.
a. CNC turning: Process the through hole of the perforation, the end face of the inner cavity and the surrounding heat dissipation tooth surface. Tools: CNC machine tools, drill bits, tap processing fixtures, flat bottom milling cutters.
b. Burr: To achieve a smooth appearance, the product's sharp corners are chamfered, deburred, and non-machined ejector pins are sharpened and polished. Equipment: 120# sandpaper, wind mill, file
c. Appearance visual assessment and 100% material inspection
Visual inspection of appearance
Product clamp caps, slag bags, gate residues, surface particles, etc. need to be removed.
The clamping line should be smoothly connected to other parts without removing sharp edges or corners.
Visual inspection of appearance
Test Equipment: Appearance visual inspection combined with colorimeter, film thickness meter, salt spray tester, hundred grid tester, alcohol resistance test, pencil test.
Visual inspection of appearance; inspection of specific quality.
Preventative measures include: Verifying surface condition after powder coating; b. Randomly inspect/test holes using a pin gauge or a hole gauge.
Thoroughly inspect the goods and packaging.
Consumables: dividers, containers, bubble wrap and desiccant
Testing instruments: Calipers, projectors, pin gauges, tooth gauges, visual and packaging inspection.
NOTE: Verify that the measurement device is still within its calibration window.
Prepare for transit and delivery.
Testing instruments: calipers, projectors, pin gauges, tooth gauges, outer packaging inspection, etc.

