Dongguan Zhonghui Precision Die Casting Technology Co., Ltd.
Leave Your Message
Products Categories
Featured Products

China Suppliers Factory Digital Chassis Back Panel Heat Sink for Telecom Terminal Applications

Introducing our high-quality Digital Chassis Back Panel Heat Sink, designed for optimal thermal management in electronic devices. Manufactured in China, our heat sinks are crafted by experienced suppliers and factories that prioritize performance and reliability. With superior heat dissipation capabilities, this product ensures your chassis operates efficiently under demanding conditions. Explore the benefits of sourcing from trusted China suppliers and factories for your heat sink needs, and enhance the longevity and performance of your digital devices.

  • Die Casting Machine Cold Chamber Alum Die Cast Machine 1250T
  • Die Casting Method Precision Die Casting
  • Application communication transmitter, base station
  • Machining CNC Machining
  • Material ADC12
  • Surface Cleanning + Chemical Conversion Membrane + Power spraying
  • Certification ISO 9001:2015
  • Capacity 500000 Pieces/Year
  • Transport Package Wooden Pallet
  • HS Code 7616991090
  • Origin Dong Guan of China
  • Shipment By airmail or by Sea
  • Due-date Two month

Process

1

Aluminum die casting

Specifications & Equipment
Equipment: 1250T aluminum die casting machine
Material: ADC12
Process Characteristics
  • a. Furnace temperature: 670°±20°, Material handle: 20±2MM;
  • b. Secondary materials cannot be used;
  • c. Test the material composition to confirm that it is OK and can be produced;
  • d. First piece confirmation is required after die-casting.
Precautions
  • a. The filling quality of the surface needs to be confirmed. No cold insulation, no bulging, or lack of material for the pillars.
  • b. Pay attention to the surface to avoid sticking molds, drawing molds, or poor ejector pin convexity.
  • c. The ejector pins are concave by 0-0.2mm for non-machine-added surfaces and 0-0.2mm for machine-added surfaces. The thimble needs to be convex 0-0.2mm.
2

Remove spout (Saw spout and knock out slag bag)

Specifications & Equipment
Equipment: hydraulic presses
Precautions
  • a. Pay attention to the surface without crushing or shortage of materials.
  • b. Control the appearance and size.
3

IPQC inspection

Test Tools
Caliper, projection, three-dimensional, visual inspection of appearance.
Precautions
Use measuring tools correctly and check dimensions according to drawings.
4

SHAPING

Specifications & Equipment
Process: Back shaping
Equipment: Cutting edge ruler, shaping tooling, hydraulic presses
Precautions
Within 0.3mm of the front plane of the product.
5

IPQC inspection

Method
Visual inspection of appearance.
6

CNC

Specifications & Equipment
Process: Machining of internal cavity end faces, Backside holes, Side of one end, Hole through-hole
Equipment: CNC machine, flat-bottomed gong tool, Drill Bit, Tap machining jig
Precautions
  • a. Do not overcut, missed processing;
  • b. Surface attention must not be bruised, burrs; and
  • c. Ensure that the surface finish Ra0.8, size, shape and location tolerances.
7

Air tightness testing

Specifications & Equipment
Parameters: Test pressure value in 20kpa ~ 30kpa, stabilized pressure 20 seconds, test time 10 seconds, leakage control within 0.3kpa
Equipment: Airtight Tooling, Airtightness Test Equipment
Precautions
  • a. Do a good job on the product appearance surface protection, sealing groove parts without implementation of touch scratch;
  • b. Discover the phenomenon of air leakage in time to pick out the marking.
8

100% material inspection

Method
Visual inspection of appearance.
Note
  • a. The surface of the product should not be overcut, sand holes, lack of material. Burrs, and other undesirable phenomena;
  • b. Go-no go fixed gauges inspection;
  • c. Test the flatness of the product according to the drawing;
  • d. Hold the product lightly to prevent deformation.
9

Grinding

Specifications & Equipment
Process: Chamfering R-angle, deburring, thimble shaving on non-machined surfaces, polishing and smoothing the shape
Equipment: Air grinder, 120# sandpaper
Note
Do not miss the processing, no sharp corners, burrs removed cleanly, connected to the R angle of the smooth.
10

IPQC inspection

Method
Visual inspection of appearance.
11

CLEANNING + Chemical conversion membrane + POWER SPRAYING

Precautions
  • a. No different colors, dirty, not touching and scratching;
  • b. Color according to the sample, uniform and consistent;
  • c. Powder thickness is uniform, no accumulation of tumors, no exposed bottom.
12

IPQC inspection + Special Characteristics Inspection

Method
Visual inspection of appearance.
Precautions
  • a. Surface quality confirmation after coating;
  • b. Hole need to needle gauge sampling, go-no go fixed gauges inspection.
13

Riveting and pressing D4.7 dowels

Specifications & Equipment
Equipment: Pressure riveting jig, hydraulic press
Note
  • a. Check that the pins are loaded without deviation or falling off, and that there is no bulge or pressure injury on the surface of the product;
  • b. Check the height dimension after pressure riveting.
14

Full inspection of appearance + packaging

Note
  • a. The appearance shall be inspected according to the sample. The surface shall be free of dirt, scratches, dents and defects, and the glue dispensing shall be even and without defects!
  • b. The tooth pattern must comply with the go – no go fixed gauge inspection;
  • c. The product is placed in the knife card, and then packaged.
15

FQC inspection

Test Tools
Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection.
Precautions
Whether the measuring tool is within the calibration period.
16

Shipping

Precautions
  • a. Make sure the quantity is the same as order.
  • b. Label and stamp on the outer box.
  • c. Provide a shipping report.
17

OQC shipping inspection

Test Tools
Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection.
Precautions
Whether the measuring tool is within the calibration period. Whether it is consistent with SIP requirements and customer requirements.

Frequently Asked Questions (FAQ)

Q: What is the furnace temperature and material handle requirement for the aluminum die casting process?

The furnace temperature must be maintained at 670°±20°, and the material handle must be 20±2MM. Secondary materials are strictly prohibited.

Q: What parameters are controlled during the air tightness testing?

The test pressure is set between 20kpa and 30kpa, with a stabilized pressure time of 20 seconds, a test duration of 10 seconds, and leakage controlled strictly within 0.3kpa.

Q: What tools are used in FQC and OQC inspections?

Both inspections utilize calipers, projection, needle gauges, tooth gauges, and visual inspection of both the appearance and the outer packaging. It is essential that all measuring tools are within their calibration period.

Q: What are the precautions for the CNC machining step?

Precautions include avoiding overcutting or missed processing, ensuring the surface is free of bruises and burrs, and ensuring that the surface finish reaches Ra0.8 along with correct size, shape, and location tolerances.

Q: What is required during the riveting and pressing of D4.7 dowels?

Pins must be loaded without deviation or falling off. The product surface must be checked to ensure there are no bulges or pressure injuries, and the height dimension must be verified after pressure riveting.

Q: How is the product surface protected during powder spraying and cleaning?

The process ensures no different colors, dirt, touching, or scratching. The color must be uniform according to the sample, and the powder thickness must be uniform with no accumulation of tumors or exposed bottom.