Dongguan Zhonghui Precision Die Casting Technology Co., Ltd.
Leave Your Message
Products Categories
Featured Products

China Suppliers Factory Digital Chassis Back Panel Heat Sink for Telecom Terminal Applications

Introducing our high-performance Digital Chassis Back Panel Heat Sink, designed for optimal thermal management in various electronic applications. Manufactured in China, our state-of-the-art heat sinks are crafted by experienced suppliers who prioritize quality and efficiency. As a leading factory, we offer customizable solutions to meet your specific needs. Enhance your product's reliability and longevity with our durable and efficient heat sink solutions today!
  • Die Casting Machine Cold Chamber Alum Die Cast Machine 1250T
  • Die Casting Method Precision Die Casting
  • Application communication transmitter, base station
  • Machining CNC Machining
  • Material ADC12
  • Surface Cleanning + Chemical Conversion Membrane + Power spraying
  • Certification ISO 9001:2015
  • Capacity 500000 Pieces/Year
  • Transport Package Wooden Pallet
  • HS Code 7616991090
  • Origin Dong Guan of China
  • Shipment By airmail or by Sea
  • Due-date Two month

Process

Step 01

Aluminum die casting

Equipment & Material
Equipment: 1250T aluminum die casting machine
Material: ADC12
Process Characteristics
  • a. Furnace temperature: 670°±20°, Material handle: 20±2MM;
  • b. Secondary materials cannot be used;
  • c. Test the material composition to confirm that it is OK and can be produced;
  • d. First piece confirmation is required after die-casting.
Precautions
  • a. The filling quality of the surface needs to be confirmed. No cold insulation, no bulging, or lack of material for the pillars.
  • b. Pay attention to the surface to avoid sticking molds, drawing molds, or poor ejector pin convexity.
  • c. The ejector pins are concave by 0-0.2mm for non-machine-added surfaces and 0-0.2mm for machine-added surfaces. The thimble needs to be convex 0-0.2mm.
Step 02

Remove spout (Saw spout and knock out slag bag)

Equipment
Equipment: hydraulic presses
Precautions
  • a. Pay attention to the surface without crushing or shortage of materials.
  • b. Control the appearance and size.
Step 03

IPQC inspection

Test Tools
Caliper, projection, three-dimensional, visual inspection of appearance.
Precautions
Use measuring tools correctly and check dimensions according to drawings.
Step 04

SHAPING

Details
Back shaping
Equipment
Cutting edge ruler, shaping tooling, hydraulic presses
Precautions
Within 0.3mm of the front plane of the product.
Step 05

IPQC inspection

Details
Visual inspection of appearance.
Step 06

CNC

Details
Machining of internal cavity end faces, Backside holes, Side of one end, Hole through-hole.
Equipment
CNC machine, flat-bottomed gong tool, Drill Bit, Tap machining jig.
Precautions
  • a. Do not overcut, missed processing;
  • b. Surface attention must not be bruised, burrs; and
  • c. Ensure that the surface finish Ra0.8, size, shape and location tolerances.
Step 07

Air tightness testing

Details
Test pressure value in 20kpa ~ 30kpa, stabilized pressure 20 seconds, test time 10 seconds, leakage control within 0.3kpa.
Equipment
Airtight Tooling, Airtightness Test Equipment.
Precautions
  • a. Do a good job on the product appearance surface protection, sealing groove parts without implementation of touch scratch;
  • b. Discover the phenomenon of air leakage in time to pick out the marking.
Step 08

100% material inspection

Details
Visual inspection of appearance.
Note
  • a. The surface of the product should not be overcut, sand holes, lack of material. Burrs, and other undesirable phenomena;
  • b. go-no go fixed gauges inspection;
  • c. Test the flatness of the product according to the drawing;
  • d. Hold the product lightly to prevent deformation.
Step 09

Grinding

Details
Chamfering R-angle, deburring, thimble shaving on non-machined surfaces, polishing and smoothing the shape.
Equipment
Equipment: Air grinder, 120# sandpaper
Note
Do not miss the processing, no sharp corners, burrs removed cleanly, connected to the R angle of the smooth.
Step 10

IPQC inspection

Details
Visual inspection of appearance.
Step 11

CLEANNING + Chemical conversion membrane + POWER SPRAYING

Precautions
  • a. No different colors, dirty, not touching and scratching;
  • b. Color according to the sample, uniform and consistent;
  • c. Powder thickness is uniform, no accumulation of tumors, no exposed bottom.
Step 12

IPQC inspection + Special Characteristics Inspection

Details
Visual inspection of appearance.
Precautions
  • a. Surface quality confirmation after coating;
  • b. Hole need to needle gauge sampling, go -no go fixed gauges inspection.
Step 13

Riveting and pressing D4.7 dowels

Equipment
Pressure riveting jig, hydraulic press
Note
  • a. Check that the pins are loaded without deviation or falling off, and that there is no bulge or pressure injury on the surface of the product;
  • b. Check the height dimension after pressure riveting.
Step 14

Full inspection of appearance + packaging

Note
  • a. The appearance shall be inspected according to the sample. The surface shall be free of dirt, scratches, dents and defects, and the glue dispensing shall be even and without defects!
  • b. The tooth pattern must comply with the go – no go fixed gauge inspection;
  • c. The product is placed in the knife card, and then packaged.
Step 15

FQC inspection

Test Tools
Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection.
Precautions
Whether the measuring tool is within the calibration period.
Step 16

Shipping

Precautions
  • a. make sure the quantity is the same as order.
  • b. Label and stamp on the outer box
  • c. Provide a shipping report.
Step 17

OQC shipping inspection

Test Tools
Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection.
Precautions
Whether the measuring tool is within the calibration period. Whether it is consistent with SIP requirements and customer requirements.

Frequently Asked Questions (FAQ)

Q1: What raw materials and machinery are used during the initial die casting step?
The process utilizes ADC12 material and a 1250T aluminum die casting machine under a controlled furnace temperature of 670°±20°.
Q2: What are the specific parameters required for the Air Tightness Testing step?
The testing requires a pressure value between 20kpa to 30kpa, a stabilized pressure holding duration of 20 seconds, a test time of 10 seconds, and leakage must be controlled within 0.3kpa.
Q3: What precautions are taken during CNC machining to ensure quality?
Operators must prevent overcutting, ensure no steps are missed, protect surfaces from bruises and burrs, and verify that the surface finish reaches Ra0.8 alongside correct size and location tolerances.
Q4: What is checked during the riveting and pressing of the D4.7 dowels?
Inspectors verify that the pins are installed without deviation or falling off, ensure there is no surface damage or bulging, and measure the final height dimension post-riveting.
Q5: How is the quality of the powder spraying and coating verified?
The coating is inspected to ensure color consistency matching the sample, uniform powder thickness without accumulation of tumors or exposed bottom metal, and no dirt or scratches.
Q6: What tools are utilized during FQC and OQC shipping inspections?
Both FQC and OQC inspections rely on calipers, projection equipment, needle gauges, tooth gauges, and thorough visual checks of the product appearance and outer packaging.