Introducing our premium Zinc Alloy Server Racks, expertly designed to provide robust support and superior durability for your IT infrastructure. As a leading supplier based in China, we pride ourselves on delivering high-quality products that meet the demands of modern data centers. Our factory utilizes advanced manufacturing techniques to ensure each server rack is built to last, offering optimal protection for your valuable equipment. Trust our Zinc Alloy Server Racks for stability, strength, and long-lasting performance in any environment. Suitable for businesses looking to enhance their server management, our products stand out as the top choice among suppliers in the industry
  • Die Casting Machine Hot Chamber Zinc Die Cast Machine 138T
  • Die Casting Method Precision Die Casting
  • Application communications network server racks/fixed bracket
  • Machining CNC Machining
  • Material Zamak 3
  • Surface Power spraying
  • Certification ISO 9001:2015
  • Capacity 500000 Pieces/Year
  • Transport Package Wooden Pallet
  • HS Code 7616991090
  • Origin Dong Guan of China
  • Shipment By airmail or by Sea
  • Due-date Two month

Process

Step 01

ZINC die casting

Equipment & Material 138T zinc die casting machine; ZA 3# material
Process Characteristics:
  • a. The furnace temperature is 420°±20°, and the material handle is 20±2 mm.
  • b. Secondary materials can not be used.
  • c. Material composition must be tested to ensure it is suitable for production.
  • d. The first piece must be confirmed.
Precautions
  • a. Verify the quality of surface filling. No bulging, no cold isolation, and no shortage of materials in the column.
  • b. Pay attention to the surface and avoid mold stringing, sticking or insufficient ejector protrusion.
  • c. For non-machined surfaces, the ejector pin should be concave 0-0.2mm, while for machined surfaces, the ejector pin should be convex 0-0.2mm.
Step 02

Remove spout

Tools Stick / saw machine
Things to note
  • a. Pay attention to the surface and don't damage it or use insufficient material.
  • b. Manage size and appearance.
Step 03

IPQC inspection

Testing Instruments Three CMM, appearance visual evaluation, projection, calculator
Precautions
Check dimensions against drawings and use accurate measuring equipment.
Step 04

Deburring

Equipment File, Wind mill, 120# sandpaper

Sharp angle position inverted R angle, deburring, non-machining surface top needle draping, grinding and connecting shape.

Note
No sharp corners, burrs to remove clean, along the R angle.
Step 05

SHAPING

Equipment Knife-edge ruler, shaping fixture, Rubber hammers, rubber pads

PRODUCT BACK SHAPING

Note
Within 0.2mm of the front plane of the product.
Step 06

CNC

Equipment Tapping machine, jigs
  • A-Tapping two 6-32 teeth on each side face with a depth of 5.32+0.35mm/-0.15mm.
  • B-Tapping four 6-32 teeth on front face with a depth 8mm
Note
  • a. Hold the product lightly when processing, so as not to bruise the product.
  • b. Place the products neatly and take the products to blow clean the surface of the jig.
  • c. Refer to the requirements of the inspection specification for the appearance of the products.
  • d. If there are any defects or other emergencies, please report to the superior immediately.
  • e. Please pay attention to the processing and transportation process do not touch, scratch the product surface.
Step 07

Grinding

Equipment File, wind grinder, 120# sandpaper

Remove product clamping line draping, surface particles, slag ladle, gate residue.

Note
Do not leak processing, do not exist sharp corners, draping clean, mold closing line.
Step 08

100% MATERIAL INSPECTION - APPEARANCE VISUAL INSPECTION

Note
  • a. The surface of the product must be free of overcutting, sand holes, lack of material, burrs, and other undesirable phenomena.
  • b. Via pass and stop gauge detection.
  • c. Check the flatness of the product according to the drawings.
  • d. Handle the product gently to prevent deformation.
Step 09

IPQC INSPECTION

Visual inspection of appearance.

Step 10

Cleaning + Chemical Conversion Membrane + Drying

Note
No different color, dirty, not touching and scratching.
Step 11

Full inspection of appearance + packaging

Packaging Materials Carton, knife card, clapboard, bubble bag

Comprehensive inspection of products and packaging.

Note
  • a. The appearance shall be inspected according to the sample. The surface shall be free of dirt, scratches, dents and defects.
  • b. The tooth pattern must comply with the pass-and-stop inspection.
  • c. The product is placed in the knife card, covered with flat cardboard on the upper layer, and then packaged.
Step 12

FQC exam

Calipers, projectors, pin gauges, tooth gauges, visual and packaging inspection are all examples of testing instruments.

Note
Verify that the measurement device is still within its calibration window.
Step 13

Transportation

Prepare for a rainy day
  • a. Confirm that the quantity matches the order.
  • b. Label and stamp the outer box.
  • c. Send reports on shipments.
Step 14

OQC shipping inspection

Testing instruments include calipers, projectors, pin gauges, tooth gauges, outer packaging inspection, etc.

Note
If the measuring device is still within its calibration window. Whether it meets both customer and SIP requirements.

Frequently Asked Questions (FAQ)

What are the primary material requirements for the Zinc die casting process?
We strictly utilize ZA 3# material processed with a 138T zinc die casting machine. Secondary materials are strictly prohibited, and the material composition must be verified before production.
How are surface defects minimized during deburring and grinding?
We use precise tools including files, wind mills, and 120# sandpaper to systematically eliminate sharp corners, burrs, and gate residues. Technicians must ensure that all surfaces are ground cleanly along the specified R angles.
What precautions are taken during the CNC tapping stage?
Parts must be handled with extreme care to prevent bruising and scratching. Additionally, operators must clean the jig surfaces by blowing off residues before placing each part and strictly follow the inspection specifications.
How do you verify the dimensional accuracy of the finished parts?
We employ multi-stage testing instruments including three-coordinate measuring machines (CMM), projection systems, calipers, pin gauges, and thread/tooth gauges. All measurement devices are strictly monitored to ensure they are within their calibration windows.
What packaging standard is used to prevent shipping damage?
Following a 100% appearance check, products are organized systematically into customized knife cards, protected with flat cardboard dividers, and then securely packed inside cartons with bubble bags to block external impacts.