SHENZHEN XIANGHENG TECHNOLOGY CO., LTD
Get Instant Quote
Leave Your Message
Products Categories
Featured Products

ADC12 Precision Pressure casting aluminum alloy enclosure for 5G AAU base

  • Die Casting Machine Cold Chamber Alum Die Cast Machine 350T
  • Die Casting Method Precision Die Casting
  • Application Communications Industry
  • Machining CNC Machining
  • Material ADC12
  • Surface Double-color spraying
  • Certification ISO 9001:2015
  • Capacity 500000 Pieces/Year
  • Transport Package Wooden Pallet
  • HS Code 7616991090
  • Origin Dong Guan of China
  • Shipment By airmail or by Sea
  • Due-date Two month
  • Customized Dispensing, Copper Tubing

product display

ADC12 Precision Pressure casting aluminum alloy enclosure for 5G AAU base (3)l8z
ADC12 Precision Pressure casting aluminum alloy enclosure for 5G AAU base (4)f27
ADC12 Precision Pressure casting aluminum alloy enclosure for 5G AAU base (5)vst
ADC12 Precision Pressure casting aluminum alloy enclosure for 5G AAU base (6)q36

Fetures

This cutting-edge product combines advanced technology with superior functionality to provide the ultimate solution for your base station needs.
1, Excellent heat dissipation capabilities. As the demand for high-speed data transmission increases in 5G networks, thermal management becomes critical to ensure optimal performance. Our housings are designed to effectively dissipate heat, preventing overheating and ensuring smooth operation of the base station.
2,Excellent corrosion resistance. This is especially important for outdoor installations, where exposure to harsh weather conditions can cause damage to the equipment. Our enclosures are built to withstand the elements, protecting your base station from corrosion and extending its lifespan.
 3, lightweight and easy to handle and install. This is a significant advantage, especially when it comes to deploying base stations in remote or challenging locations. The lightweight design not only simplifies the installation process but also reduces transportation costs.

Process

1, Aluminum die casting:

Equipment: 400T aluminum die casting machine, Material: ADC12


Process characteristics

a. Furnace temperature: 670°±20°, Material handle: 20±2MM;
b. Secondary materials cannot be used;
c. Test the material composition to confirm that it is OK and can be produced;
d. First piece confirmation is required after die-casting.

Precautions:

a. The filling quality of the surface needs to be confirmed. No cold insulation, no bulging, or lack of material for the pillars. 
b. Pay attention to the surface to avoid sticking molds, drawing molds, or poor ejector pin convexity. 
c. The ejector pins are concave by 0-0.2mm for non-machine-added surfaces and 0-0.2mm for machine-added surfaces. The thimble needs to be convex 0-0.2mm

2, Remove spout (Saw spout and knock out slag bag)

Equipment :  Sawing machine
Tools:  wooden stick

Precautions:

a, no crush injury or shortage of materials
b, Control the size and appearance.

3, IPQC inspection (check dimensions according to drawings)

Test tool: Caliper / Projection / Three-dimensional

Precautions:

Use measuring tools correctly and check dimensions according to drawings.

4, Shaping (Product back shaping)

Product back shaping
Equipment : knife-edge ruler, shaping fixture

Precautions:

Within 0.25mm of the front plane of the product

5, CNC

a: CNC- CNC machining (Process the end face of the inner cavity, the end face of the surrounding heat dissipation tooth surface, and the through holes of the tooth holes.)
b: Deburring (The sharp corners of the product are chamfered, deburred, non-machined ejector pins are sharpened, and polished to smooth the appearance.)
 c:100% inspection
Use of equipment and tools:
CNC machine/ Flat-bottomed cutter/ Drill bit
Tap processing fixture/ File / Wind grinder / 120# sandpaper

Precautions:

a, Do not over cut, no sand holes、no sharp corners、miss processing; without scratch, no burr; and the R corners should be connected smoothly.
b. Ensure the finish of the processed surface is Ra 0.8,  control the size and shape tolerances.
c.. Inspection by go gauge and no-go gauge .
d. Check the flatness of the product according to the drawing
e. Handle the product gently to prevent deformation

6, Polishing, (manual removal)

Remove product clamping line caps, surface particles, slag bags, and gate residues

Precautions:

- No processing be missed, no sharp corners, no harp edges and the mold closing line should be connected smoothly.
b. Ensure the finish of the processed surface is Ra 0.8,  control the size and shape tolerances.
c.. Inspection by go gauge and no-go gauge .
d. Check the flatness of the product according to the drawing
e. Handle the product gently to prevent deformation

7, Outsourcing

Powder spraying + Oil Spraying(Two-color spraying in separate areas)
Test tools:
Appearance visual inspection + film thickness meter + colorimeter + salt spray tester + hundred grid test tool + alcohol resistance test + pencil test

Precautions:

a,The coloring and anti-bake fractal areas are obvious, no different colors, dirt, exposed bottoms, dust accumulation, scratches, etc.;
b, The color is consistent with the sample;

8, IPQC inspection/IQC incoming inspection
Precautions:

a. Confirm the surface quality after powder spraying;
b. The holes need to be randomly inspected by needle gauge,inspection by go gauge and no-go gauge.

9,  100% inspection (Check the appearance of powder spraying)

a, 100% inspect the appearance of the powder-coated.
b, Conduct random inspections for the powder-coated performance test)

Precautions:

1. The painted and anti-bake fractal area is obvious, and there is no abnormal color, dirt, exposed bottom, dust accumulation, scratches, etc.;
2. The color is consistent and uniform according to the sample;

10, Dispensing glue (Dispense adhesive to the specified bar area, dispensing width and height 1.0±0.1 symmetrically centered.)

Tools: Dispensing machine, dispensing fixture

Precautions:

1. Glue strips is uniform, no breakage, accumulation, drawing, glue overflow, deviation, bubbles, falling off, etc.
2. Ensure that the glue does not regenerate well or does not stick, and the glue strength is not ideal, etc.

11, Assembling (Assembly of accessories)

a, Corresponding assembly position of heat dissipation copper bar for glue assembly;
b, Lock the corresponding position of sheet metal parts M2.5*5 screws to press the heat dissipation copper block;
Parts

SE4450 Glue
4x Heatsink Copper Bars
3x Sheet metal parts
6x M2.5*5 half-round screws

Precautions:

a, Copper bar dispensing slot is filled with glue according to the sample;
b, Ensure that the lock screw position is stable without loosening and slipping teeth.

12, Baking (drying)

Put the products in 2 columns and 7 rows, total 14pcs neatly on the baking line, baking temperature 150℃, time 30 minutes.
Equipmen : dryer

Precautions:

Leave a certain gap between the product placement, pay special attention to not touching the tunnel door; hold lightly; do not touch the scratches;

13, 100% inspection(100% inspection of appearance + packaging)

Precautions:

a,The appearance shall be inspected according to the sample. The surface shall be free of dirt, scratches, dents and defects, and the glue dispensing shall be even and without defects!
b,The tooth pattern must comply with the go gauge and no-go gauge;
c, The product is placed in the knife card, covered with flat cardboard on the upper layer, and then packaged.

14, FQC inspection

Test Tools: Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection

Precautions:

Whether the measuring tool is within the calibration period.

15, Shipping

Precautions:

a. make sure the quantity is the same as order.
b. Label and stamp on the outer box
c. Provide a shipping report.

16, OQC shipping inspection

Test Tools: Caliper, projection, needle gauge, tooth gauge, appearance and outer packaging inspection

Precautions:

Whether the measuring tool is within the calibration period. Whether it is consistent with SIP requirements and customer requirements.